Skip to content

Commercial energy · Greater Baltimore

Energy upgrades designed to pay their own way.

Electrification and efficiency for commercial, industrial and nonprofit buildings across the Baltimore metro — with solar and storage where they make sense.

Where we start

Your last 12 months of utility bills

Where your energy dollars go

Upgrades ranked by savings

What each one costs — and saves

Baltimore metro

Commercial, industrial and nonprofit buildings

Data-driven design

15-minute interval and tariff analysis

Bankable engineering

PE-stamped designs and savings models

C‑PACE ready

Projects prepared for Maryland’s MDPACE program

What’s changing

The rules for building energy are changing — on a schedule.

Building performance standards, net-metering changes and federal deadlines are reshaping the economics of every building in the region. Planning ahead is most of the work.

July 1, 2027

Legacy net metering closes

Maryland’s current net-metering program closes to new systems, and a successor program takes its place.

Dec 31, 2027

Federal solar credit deadline

Solar projects that start construction after July 4, 2026 must be in service by year-end to claim the federal credit.

Every June 1

BEPS benchmarking

Most Maryland buildings of 35,000 sq ft or more report their energy use every year.

2030

Emissions standards begin

Buildings are held to a standard for fuel burned on site — a strong case for electrifying heat and hot water.

Dates as of November 2026.

What we do

One team for the whole project.

Energy analysis

Interval data and tariff modeling that show where the savings are — and what each upgrade is worth.

Efficiency upgrades

LED lighting, controls and HVAC optimization — usually the fastest payback in the building.

Electrification

Heat pumps and electric water heating, timed to your equipment’s replacement cycle.

Solar & storage

On-site power and batteries where the roof, the load and the rate support them.

BEPS compliance

Annual benchmarking and a 2030 plan built around the fuel your building burns.

C‑PACE project development

Projects prepared for Maryland’s C‑PACE program and conventional financing.

Who we work with

Built for the buildings that keep Baltimore running.

Owner-occupied industrial

Warehouses, food distribution, cold storage and light manufacturing — where energy is a real line item.

Leased commercial property

Office, retail and flex buildings, with project structures that work for owners and tenants.

Nonprofits & congregations

Schools, congregations and community buildings, with funding paths designed for tax-exempt owners.

How we work

Four steps. No surprises in any of them.

Screen

Share 12 months of utility bills. We’ll tell you quickly whether there’s a project worth pursuing.

Analyze & propose

Detailed load and savings analysis, an engineering review and a proposal with year-by-year cash flow.

Financing

We prepare the project for C‑PACE or conventional financing and support you through closing.

Build & verify

We procure the equipment and manage permits, trades, inspections and commissioning.

Have a building in the Baltimore area?

Tell us the basics. We’ll reply with the next step.