Services
From the first bill to the final inspection.
Energy analysis, project development and delivery for efficiency, electrification, solar and storage projects across the Baltimore metro.
Services
Energy analysis, project development and delivery for efficiency, electrification, solar and storage projects across the Baltimore metro.
Every project starts with how your building actually uses energy.
Utility bills and 15-minute interval data, with your authorization
Rate and tariff modeling
Upgrade options ranked by savings and cost
Year-by-year cash flow for each option
The cheapest energy is the energy you don’t use.
LED lighting and controls
Building automation and HVAC optimization
Envelope and HVAC assessments
Measured savings after installation
Efficient electric systems that replace fuel burned on site, planned around your equipment’s replacement cycle.
Heat pumps for heating and cooling
Heat-pump water heating
Electrical capacity planned in advance
Timing aligned with BEPS deadlines
On-site power where the roof, the load and the rate support it.
Rooftop and carport solar
Batteries for demand-charge savings and backup power
Production modeled with industry-standard tools
Utility interconnection managed for you
Maryland’s Building Energy Performance Standards require annual benchmarking for most buildings of 35,000 sq ft or more, with emissions standards from 2030.
ENERGY STAR Portfolio Manager setup and annual filing
A 2030 roadmap built around on-site fuel use
Upgrades timed to equipment end of life
BEPS measures fuel burned on site, so electrifying heat and hot water is what moves the number.
Maryland’s C‑PACE program lets owners pay for qualifying upgrades through a charge on the property tax bill.
Pre-application and application prepared for you
Engineering package for the program’s technical review
Coordination with your capital provider through closing
How we work
We review 12 months of utility bills and the building basics, and tell you quickly whether there’s a project worth pursuing.
Detailed load and savings modeling, an engineering review, and a proposal with year-by-year cash flow.
We prepare the application package and work with your capital provider through closing.
We procure the major equipment and coordinate permits, trade partners and inspections.
Commissioning, utility approvals and performance tracking after handover.
Most owners have these on hand:
12 months of utility bills, or permission to pull them
Basic building details — size, age and main equipment
Tell us the basics. We’ll reply with the next step.